(Solved by Humans)-INCREASING WELL PRODUCTION: referring to KGS open file re[port
Paper Details
? INCREASING WELL PRODUCTION:?? referring to KGS open file re[port 202-25c, prepared by Hecoy, Macfarlane, Wilson; I want to change the?K( hydraulic conductivity)?of Ogallala formation by artificially-Induced fracturing.? The proposal is to drill 3- 6-8 inch wells in a 50 ft radius from the producing well, charging each well with high explosives. This action, in effect, would?cause the producing well to act as if the diameter was a 100 feet instead of 16-18 inches.? Present well produces ~25 gpm from 45 ft of saturated, consolidated formation.? The wells from this general?location have been produced open hole (no casing).? In late '30's to early 40's production was ~6oo-900 gpm.? SWL has been stable for ~10 years.? My interest is to increase production to ~250 gpm.? My primary interest is the amount of high explosive to charge each of the 3 wells with????RUSSELL??
??
Bypass any proctored exams 2025. Book your Exam today!
Failing attempts? Confusing materials? Overwhelming pressure?
✨ We help you pass your exam on the FIRST TRY, no matter the platform or proctoring software.
✅ Real-time assistance
✅ 100% confidential
✅ No upfront payment—pay only after success!
? Don’t struggle alone. Join the students who are passing stress-free!
? Visit https://proctoredsolutions.com/ and never get stuck with an exam again.
? Your success is just one click away!
STATUS
Answered
QUALITY
Approved
ANSWER RATING
This question was answered on: 10 May, 2025
Solution~000800966.zip (25.37 KB)
This attachment is locked
Our expert Writers have done this assignment before, you can reorder for a fresh, original and plagiarism-free copy and it will be redone much faster (Deadline assured. Flexible pricing. TurnItIn Report provided)
$11.00 ~ Download Solution (Human Written) Rewrite this Paper Afresh for me, no Ai